top of page
RobPerry_SquamishEnduro_ig_robperry__47.jpg

RAWK & ROUTE

PROJECT

The Rawk & Route Project represents the Squamish Enduros contribution to the trails that enrich our community. Supported by Woodfibre LNG, our initiative strives for long term trail development, revitalization and restoration.

rawk (RAH-awk)

noun. 

1. a dense fog.

2. a slang word, a spelling variant of "rock," typically used to express enthusiasm or excitement.

route (ruːt)

noun.

 

a way or course taken in getting from a starting point to a destination.

route is sometimes confused with root

Sustainable Builds

Our experienced team works with the land manager, provincial recreation officer, and in conjunction with the Squamish Off-Road Cycling Association. Projects range from single season to multi-year, and are founded on sustainable, long lasting construction practices.

Deliverance  2024

A long forgotten trail, Deliverance was resurrected and is now a locals favourite. By adding catch berms, improving alignment, and addressing drainage issues we enhanced the trails tread, stability, and speed. Not for the faint of heart, this rebuild saw a massive amount of rock being moved by hand and repurposed elsewhere. Unveiled for the Squamish Enduro Full Course, Deliverance won Trailforks Trail of the Month for April 2024.

Cougar Ridge  2025

Built in the late 90's, Cougar Ridge once represented the pinnacle of freeride and rock slabs in Squamish. Host trail of The Rockstar Invitational for over a decade, Cougar Ridge saw limited traffic after 2010. The concept of bringing back The Rockstar for the 2025 Squamish Enduro spurred the idea to rehabilitate this classic and make it famous again. Once a trail for technical wizardry, it now goes - full speed ahead.

Thank you to Woodfibre LNG for supporting the Rawk and Route project. As a neighbour in our community, their contribution reflects a shared commitment to investing in Squamish’s natural spaces and helping to maintain the trail network we all enjoy.

Completed Projects

Deliverance
2024

Cougar Ridge 
2025

2026 TBA

Construction by Matt Bolton, Anton Urtan, and Jordan Graves, Honza Winter, Jade Leicht

120 hours

Construction by Matt Bolton, Eric Armour and Scott McKay

110 hours

...

rawk&route1.png

RAWK & ROUTE

PROJECT

RobPerry_SquamishEnduro_ig_robperry__77.jpg

© 2025 WN Productions Inc. All rights reserved

bottom of page